Dry-docking & Voyage Repairs _old

Dry-docking & Voyage Repairs _old


Dedicated collaborating shipyards

Turkey

up to Suezmax

Middle East

a major collaboration – let’s discuss

China

XINYA (Zhoushan) – up to VLCC
LONGSHAN (Zhoushan) – up to Capesize
PAXOCEAN (Zhoushan) – up to VLCC
HUAFENG (Zhoushan & Daishan) – up to VLCC
CUD (Weihai) – up to VLCC
SHANHAIGUAN (Hebei) – up to VLCC
FUJIAN HUADONG (Fuzhou) – up to VLCC
WENCHONG (Guangzhou) – up to VLCC

Vietnam

HA LONG DOCKYARD (HLD) – up to Panamax
(new VLCC graving dock soon)



More collaborating shipyards

Turkey

OZATA – up to Post Panamax

TERSAN – up to Suezmax

SELTAS – up to Panamax

Spain

ASTICAN & ASTANDER – up to Supramax

Romania

SNC – up to Capesize

Bulgaria

ODESSOS – up to 90,000 DWT

MTG DOLPHIN – up to Handysize (up to 30m)

Poland

REMONTOWA – up to Post Panamax

Singapore

PAXOCEAN – up to Supramax

Indonesia

PAXOCEAN (Batam) – up to Newcastlemax

ASL (Batam) – up to VLCC

Panama

ASTIBAL – up to Panamax

Jamaica

GSRJ – up to Panamax

Steel, piping, electrical – prefabrication & voyage repairs via riding teams

1000 personnel in total by 3C Metal Group, distributed at own prefabrication bases; in addition, 3C Metal’s riding teams, can be mobilized to meet Owners’ requirements.

  • UAE (Dubai)
  • S.Arabia
  • Malaysia
  • S.Africa
  • Namibia
  • Mozambique and
  • USA (Huston), with